Excavation onsite exposed existing building foundations and basement walls. Abandoned utility pipes, bricks, and even old door knobs were uncovered during the site excavation. After the unsuitable soils were removed and hauled offsite, moisture controlled fill, low volume change material and limestone screenings were brought back onsite to fill the site back to grade level.
Excavation of site in progress
Removal of abandoned utility pipe




No comments:
Post a Comment
Note: Only a member of this blog may post a comment.