The interior space of the building continues to take shape. Drywall and taping is complete on 2nd floor and painting has commenced. The restrooms have been rocked, taped and plumbing rough-in complete ready for tile to start next week. The Town Hall hard-lid ceiling has been framed, AV equipment infrastructure in place, above ceiling inspections complete and its ready to be sheetrocked at the end of this week. Installation of the single hydraulic elevator continues, with completion expected at the end of the week. Vestibule glass has been set, with the aluminum door installation to follow. With a break in precipitation, grading opperations have commenced in the courtyard and on the east and north sides of the building.
Town Hall Ceiling ready for Drywall Installation
Elevator Pit - Elevator Installation Progress
Elevator Door and Threshold Set
Plumbing Rough-In Complete - Restroom Ready for Tile Installation
Painting Progress on 2nd Floor
Painted Walls at Open Office - Primed & First Coat
Vestibule Glass Installed - Looking South
Glass & Frame Installed at Vestibule Entrance
Storm Water Pipe Installation at North Elevation